NEW QUESTION # 43
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material type
- B. By plant
- C. By change number
- D. By material status
Answer: A,B
NEW QUESTION # 44
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?
- A. Quality management
- B. Process order management
- C. Batch management
- D. Engineering change management
Answer: C
NEW QUESTION # 45
What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A. Order type
- B. Planning strategy
- C. Requirements type
- D. Requirements profile
Answer: B,C
NEW QUESTION # 46
What is a work center hierarchy?
- A. A group of work centers in a parallel sequence that is used to split production quantities work on them in parallel
- B. A group of alternative work centers for production structured in hierarchy levels by priorities
- C. A group of work centers in a production line being used in sequence for production
- D. A group of alternative work centers providing a cumulative available capacity for production
Answer: D
NEW QUESTION # 47
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. You have the option to use forecast planning.
- B. Manufacturing time for final assembly is reduced.
- C. You have the option to use make-to-order production.
- D. The delivery time is reduced.
Answer: A,C
NEW QUESTION # 48
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to Waiting
- B. When you set the container to Empty
- C. When you set the container to In transit
- D. When you set the container to Full
Answer: B
NEW QUESTION # 49
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Non-plant item
- B. Work item
- C. WBS item
- D. Class item
Answer: A,D
NEW QUESTION # 50
How do you assign resources in a master recipe with operations and phases?
- A. You assign resources to the sub-operations.
- B. You assign resources to the phases.
- C. You assign resources to the header of the master recipe.
- D. You assign resources to the operations.
Answer: D
NEW QUESTION # 51
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. In which storage location is the BOM required?
- B. Is the material type allowed in the BOM?
- C. What status does the BOM have?
- D. Which base unit of measure does the material have?
Answer: B,C
NEW QUESTION # 52
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched.
How does the insertion take place?
- A. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
- B. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- C. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
- D. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
Answer: C
NEW QUESTION # 53
You want to set up a maketoorder planning scenario for a finished product. The bill of material contains two components: one should be procured for eac sales order individually the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
- A. Choose planning strategy 20 (MaketoOrder) select the corresponding Mixed MRP indicator.
- B. Choose planning strategy 50 (Planning without final assembly) select the corresponding Mixed MRP indicator.
- C. Choose planning strategy 50 (Planning without final assembly) select the corresponding Individual/Collective indicator.
- D. Choose planning strategy 20 (MaketoOrder) select the corresponding Individual/Collective indicator.
Answer: D
NEW QUESTION # 54
How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.
- A. They are created together with the independent requirement for the finished product.
- B. They are only created for multilevel bill of material (BOM) structures.
- C. They are created on the assembly level during the planning run.
- D. They are created with exact times in Advanced Planning.
Answer: C,D
NEW QUESTION # 55
Where does the system check master data selection settings during the creation of planned orders production orders? Note: There are 3 correct answers to this question.
- A. In the work centers
- B. In the production version
- C. In the bill of material (BOM)
- D. In the routing
- E. In the MRP controller
Answer: C,D,E
NEW QUESTION # 56
How do you model a production line in repetitive manufacturing?
- A. Asa
- B. Asan operation
- C. As a resource network
- D. As awork center
- E. routing
Answer: D
NEW QUESTION # 57
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?
- A. The operation CANNOT be dispatched.
- B. The operation is rescheduled in the planning direction.
- C. The operation is rescheduled backwards.
- D. The operation is rescheduled to an alternative work center.
Answer: B
NEW QUESTION # 58
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero the discontinuation date is in the past?
- A. Kanban
- B. Material requirements planning
- C. Back flushing
- D. Production order release
Answer: B
NEW QUESTION # 59
Your project uses process orders for the production of liquid chemicals.
What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.
- A. Resource selection
- B. Resource network
- C. Resource hierarchy
- D. Resource matrix
Answer: A,B
NEW QUESTION # 60
What is the difference between coproducts byproducts?Note: There are 2 correct answers to this question.
- A. Only coproducts have movement type 101.
- B. Only coproducts have a nonzero inventory valuation.
- C. Only coproducts appear in the process or production order settlement rule.
- D. Only coproducts have movement type 531.
Answer: A,C
NEW QUESTION # 61
......